SCN-002: MITRE ATT&CK Technique Mapping¶
This Reference preserves the recorded requirement contract.
The front matter states its lifecycle status; this editorial notice does not change that status.
An ACTIVE contract is not a historical implementation or qualification result.
The statement, rationale, identifiers, and traceability below keep their recorded meaning.
The original file is available at source revision 6d35d245f11a.
Statement¶
Every scenario shall declare the MITRE ATT&CK tactics and techniques it exercises, both at the scenario level and at each step. This shall enable ATT&CK coverage analysis across scenarios.
Rationale¶
MITRE ATT&CK is the standard framework for describing adversary behavior.
Traceability¶
- IMPLEMENTS → ADR
docs/adrs/adr-009-scenario-engine.md(ADR-009: Scenario Engine)