EXP-011: Apparatus Readiness and Validity Gate¶
This Reference preserves the recorded requirement contract.
The front matter states its lifecycle status; this editorial notice does not change that status.
An ACTIVE contract is not a historical implementation or qualification result.
The statement, rationale, identifiers, and traceability below keep their recorded meaning.
The original file is available at source revision 6d35d245f11a.
Statement¶
Before a campaign and where configured before each trial, APTL shall run a recorded apparatus gate covering ACES backend conformance, clean-state/isolation, safety controls, required services, collector readiness, clock synchronization, storage headroom, resource budgets, artifact availability and digest verification, and declared measurement-channel health. Thresholds and fail/warn policy shall be strict, versioned AptlConfig settings. Required gate failures shall prevent execution; warnings and waivers shall be explicit evidence in every affected run. The gate shall be extensible through capability-declared checks and shall not execute arbitrary code from experiment inputs.
Rationale¶
Cyber-range configuration and measurement health affect validity. A self-test and readiness record make APTL behave like a scientific instrument instead of merely starting containers, while preserving configurable local operation and fail-closed safety.
Traceability¶
- DOCUMENTS → GITHUB_ISSUE
Brad-Edwards/aptl#753(EXP-011: Apparatus readiness and validity gate)